Texas · Multiple measures
SAWS: Residential Irrigation Design Rebate
San Antonio Water System (SAWS) pays full removal $1,650–$4,150 by zone count; $350 per zone removed; $100 per zone converted to pressure-regulated heads; $200 master valve, up to $5,000. The program is open: funding may be limited by budget; offer expires 1 year after consultation; page modified Oct 29, 2026.
| Rebate | Full removal $1,650–$4,150 by zone count; $350 per zone removed; $100 per zone converted to pressure-regulated heads; $200 master valve |
|---|---|
| Maximum | up to $5,000 |
| Minimum area | Not stated |
| Status | Open Funding may be limited by budget; offer expires 1 year after consultation; page modified Oct 29, 2026 |
| Pre-approval before work | Required |
| Artificial turf | Not stated |
| Contractor | Optional (DIY allowed) |
| Who it serves | San Antonio |
Official program page Check my plan
The rules that set this program apart
- Irrigation consultation required before any work
- 10% bonus if finished and inspected within 90 days
- Full removal means backflow, valves, controller and all heads removed
- Homeowner or licensed irrigator may do the work
Quick answers
How much does Residential Irrigation Design Rebate pay?
Full removal $1,650–$4,150 by zone count; $350 per zone removed; $100 per zone converted to pressure-regulated heads; $200 master valve, up to $5,000, according to San Antonio Water System (SAWS) (checked 2026-11-18).
Do I need approval before starting?
Yes. San Antonio Water System (SAWS) requires approval before you begin work. Projects started early are generally ineligible.
Do I have to hire a contractor?
No. You can do the work yourself, though you still have to meet every program rule.
Want a landscaper who knows this program?
Tell us about your yard. We'll connect you with a landscaper who works on rebate projects in your area, or send you San Antonio Water System's own contractor resources if we don't have one nearby yet.
Get a quoteLast verified 2026-11-18 against the official page. Rebate amounts and funding change; the utility's page is the final word.